VASCO (801) 692-7924 Get a quote
VASCO
Call (801) 692-7924

Commercial painting, build-outs and shelving for American Fork flex and warehouse space.

Much of American Fork's commercial space is flex: an office up front, a warehouse and a roll-up door behind. We paint and build out the office side and assemble steel shelving on the warehouse side.

Metalsistem shelvingWarehouse officesNext door to our Lehi base
Freestanding steel shelving bays assembled in a back-of-house stock room

One unit, two kinds of work

A typical unit in North Pointe Business Park, Catalyst Business Park or along Auto Mall Drive pairs finished office space with open warehouse. Tenants often hire a painter for one half and a rack installer for the other.

We do both under Utah B100 #12546496-5501. Painters who finish drywall handle the office. Our install crews, who have assembled Metalsistem shelving for a national grocery chain, handle the warehouse.

Demising walls on the warehouse side take pallet and forklift hits. We cut out the damaged board and refinish it before paint.

For a new tenant, that means a single walk and a schedule that puts paint ahead of fixtures.

Installer measuring shelf beam height during a shelving install
Checking level on a shelving run before the next bay goes up.

What we do in a flex unit

Any of these scopes can sit on one quote as separate lines.

Warehouse office repaint

Walls patched and repainted, doors and frames refreshed, stained ceiling tiles replaced. Done between tenants or over a weekend while you operate.

Small build-outs

A new office, a demising wall or a break room, framed, finished and painted. Electrical, plumbing and HVAC are performed by licensed trade partners under our contract.

Shelving and racking

Boltless steel shelving assembled by the bay, anchored and checked for level. Metalsistem USA, our sister company, can supply the product.

Floor and site markings

Aisle and safety lines inside, stall striping and stencils outside, bollards and dock doors painted.

Before racks go up in American Fork

Rack height decides the paperwork. These are the thresholds Utah cities generally apply, and American Fork's building and fire officials make the final call. We identify what applies at the walk and coordinate drawings with licensed engineers.

  • Up to 5 ft 9 in: usually no building permit
  • Over 5 ft 9 in: generally a building permit
  • 8 ft and taller: generally stamped structural drawings with seismic anchorage
  • Storage above 12 ft: can trigger a high-piled storage fire review

The closest city to our base

American Fork begins a few miles south of our office in Lehi. State Street and I-15 both connect the two, so a freeway backup rarely decides when we arrive.

Short drives make split schedules practical. We can paint before your freight arrives and come back to assemble shelving once it lands.

Paint and repair visits are scheduled 3 to 4 business days out. Shelving installs are set against the delivery date for the material.

  • Bring the lease plan and a bay count to the walk
  • Supply and install quoted together when you need product
  • Punch walk before you load the shelves
Salt Lake CitySandyDraperLehiHome baseAmerican ForkOremProvoPark City

FAQ

Questions about American Fork flex space

Can you install shelving and paint the office in the same job?

Yes. Paint goes first and shelving second, so nothing gets masked twice. Both scopes sit on one quote as separate lines.

Do I need a permit for warehouse racks in American Fork?

It depends on height. In Utah, racks over 5 ft 9 in generally need a building permit, and racks 8 ft and taller generally need stamped drawings. City officials decide, and we confirm what applies before install.

Can you work while our warehouse is operating?

Yes. We section off the aisle or office we are working in and keep your travel paths open. Night and weekend shifts are available if daytime work would stop your picking.

Do you supply the shelving or only install it?

Either. We install Metalsistem systems, and fixtures from other manufacturers when you send the plan and bill of materials. Metalsistem USA supplies product when you need it quoted with the install.

Do you also paint homes in American Fork?

Yes. House painting and drywall repair are on our residential pages. Homes built before 1978 can fall under lead-safe renovation rules. Tell us the year the home was built and we will confirm how the job has to be handled before we price it.

Send the unit number and the bay count.

Add photos of the office walls and text it all to (801) 692-7924. One written quote covers both sides within 24 to 48 hours of the walk.